Terra Nova Offshore Opportunity
  • The Terra Nova Floating Production Storage and Offloading (FPSO) vessel offered attractive capabilities over the expected 15-17 year life of the Terra Nova reservoir.
  • But there are challenges associated with FPSOs. The conditions are harsh for the operating equipment. On-board turbines are expected to run essentially non-stop in high seas.
  • Among the components that made up the Terra Nova FPSO were a pair of Thomassen/General Electric PG6561B Frame 6B Heavy Duty Gas Turbines that are used for power generation. These turbines employ a geared speed reduction system. In this type of application, the lubricant has to do double duty, lubricating both the turbine bearings and gears.
  • Petro-Canada’s TURBOFLOTM EP has excellent oxidation and thermal stability, antiwear protection, corrosion inhibition as well as exceptional water and air separation. This makes them ideal for modern heavy-duty gas turbines.
  • “We’re pleased with the results. In September (2005) we changed out the initial fill. That was after about 28,000 fired hours of operation.”

About Terra Nova

The Terra Nova FPSO, producing in the North Atlantic 350 kilometres southeast of Newfoundland and Labrador, Canada, is one of the largest FPSO vessels ever built, at a length of 292.2 metres, a width of 45.5 metres and it stands more than 18 storeys high. The FPSO can store 960,000 barrels of oil and accommodate up to 120 personnel while producing. Terra Nova is a joint venture owned by seven oil companies, including Suncor Energy (the Operator), with a 37.6% working interest..

“These are demanding conditions. Terra Nova has to maintain production in the heavy Atlantic seas, with a lot of wave action. TURBOFLO EP has provided 15 years of service, no hiccups. Terra Nova’s turbines have been running for approximately 97,000 hours and counting. TURBOFLO EP has given Terra Nova multiple years of stable and reliable operation in a harsh marine environment under all operating conditions.”

Colin Haley,
P. Eng. Mechanical Engineer,
Terra Nova FPSO

DownloadPDF

(PDF, 395.83 KB)

ReadTheCasestudy

TURBOFLO

TURBOFLO™

Extends intervals between oil top-up or change-outs

ExploreBrand

Related Resources

Article

Achieving Energy Efficiency in Today’s Natural Gas Turbines

ArticleCTA
Brochure
Plant operations

Gas Plant & Pipeline Lubricants

DownloadPDF

(FileType, 3 MB)

ExpertQA

Gas Plant, Pipeline & Power Gen: Upgrading Your Lubricant – How Petro-Canada Lubricants Provides Support

ExperQACTA