Rain Forest Aerial Tram
  • Rain Forest Aerial Tram takes the safety of its customers very seriously. For this reason, the products used to maintain the lift must offer total security. That’s why the performance of the grease used in their equipment is vital; their customers’ safety depends on the reliable operation of their equipment.
  • “In our area of the rainforest, we deal with wide temperature ranges and a lot of rain – about 18 feet (5.4 metres) each year. Because of these weather conditions, we have to be especially meticulous about the protection of the tram’s bearings.”
  • To find a grease that would protect their equipment under the wet conditions in which they operate, Rain Forest Aerial Tram consulted their supplier, who suggested PEERLESSTM OG2.
  • With PEERLESS OG2, the tourism company experiences less loss, more bearing protection and excellent water resistance, which results in extended maintenance intervals.

About Rain Forest Aerial Tram:

Rain Forest Aerial Tram is a world-class sustainable tourism company. Each year, the company provides thousands of tourists from all parts of the world with the opportunity to explore the treetops of the Costa Rican rainforest by tram. Serving as a wildlife reserve and eco-tourism and research park, Rain Forest Aerial Tram promotes environmental awareness and the conservation of endangered natural resources through innovative educational experiences. Built in 1994, the eco-tourism company’s Atlantic tram was the first rainforest lift in the world. The modified ski lift was built in the middle of 1,200 acres (480 hectares) of dense jungle without cutting down a single tree. Each of the tram’s 25 gondolas were designed to transport six tourists and one bilingual guide.

DownloadPDF

(PDF, 444.41 KB)

ReadTheCasestudy

Peerless

PEERLESS™

Reduce operating costs in your operation

ExploreBrand

Related Resources

CaseStudyQuote

"...I’ve probably cut my downtime by half.”

Jamie Enright,
Owner/Operator,
M.J. Enright and Sons Logging, Inc.

ReadCase Study
CaseStudyQuote

“Our maintenance time was cut in half.”

Craig Price,
Vice President,
Operations, Morbark

ReadCase Study